ERDI LRF Specs

Home › Answers › What should a buyer ask a Chinese rangefinde

What should a buyer ask a Chinese rangefinder module supplier before ordering?

Six questions separate a supplier who can hold a specification from one who cannot: the test condition behind the published range, the near-range limit, the interface actually implemented in firmware (not the datasheet header), the module-level laser class with its measurement condition, the first-article report you will receive, and what happens to the timing budget when temperature drifts. Ask for each in writing; a supplier who answers all six in numbers is a supplier you can audit.

Matching modules from the catalogue

ModelWavelengthPublished rangeAccuracyMassInterface
LRF1829C1535 nm23 km±2 m400 gRS-422
LRF1830C1.54 µm23 km±2 m400 gUART + RS-422
LRF1525C1.54 µm15 km±2 m400 gRS-422
LRF1221C1.54 µm12 km±2 m275 gRS-422
LRF1222C1.54 µm12 km±2 m335 gRS-422
LRF1831C1535 nm12 km±2 m410 gRS-422

The conditions behind those numbers

Full detail and the manufacturer's original wording: first article inspection · all 59 range conditions · filter the catalogue yourself

Questions people ask about this

Why ask for the test condition rather than the range?

A range number without a target size, reflectance and visibility is not comparable to anything. Two suppliers can both say 1500 m and mean 1500 m against a 90 % wall versus 600 m against a deer. The condition is the specification.

What is the first-article report?

The document you receive with the first production units: serial numbers, the measured range at a stated target, accuracy against a reference, and the laser class measurement. If a supplier has no template for this, they have no process behind the number.

What does 'interface implemented in firmware' mean?

The datasheet may list UART, RS-422 and CAN. What matters is which one the shipped firmware actually speaks, at what baud, with what trigger protocol, and whether the CRC and timing are documented. Ask for the protocol document before the sample, not after.

Should I test the module or the finished product?

Both, in that order. Module-level tests catch optics and timing; product-level tests catch vignetting, window loss and thermal drift. The module test is the one that tells you whether the supplier is consistent batch to batch.

Is a Chinese module supplier a risk for a European product?

It is a supply-chain decision, not a nationality one. What reduces risk is documentation you can audit, a first-article report, a stated change-notification process, and the ability to answer a technical question in writing. Ask for those before price.

Other buyer questions answered the same way

Send the requirement, not a part number Target size, reflectance, required range, mass budget, interface, quantity. Two candidates and their limiting factor come back. Email specs@erdilrf.com All answers

Figures transcribed from the linked manufacturer pages. Conditions are quoted verbatim; nothing here extrapolates a range to a target the manufacturer did not test.

Need a quote on this? or get the 905/1535 selection table