ERDI LRF Specs

Home › Docs

Documents an integrator should demand

Three working documents: the protocol checklist, the first-article inspection content, and a range test report template. They are published because the fastest way to judge a supplier is to see whether they can answer a document question precisely.

Serial protocol checklist

Twelve fields a protocol document must state — framing, endianness, checksum coverage, error codes, timing, example transcript.

First article inspection

What an FAI record carries, and why a supplier who cannot produce one is selling samples.

Range test report template

Twelve fields that turn a range number into something another engineer can check.

Need an interface document for a model? Send the model code. Email tommy@erdimail.com Buyer answers