Home › Docs
Documents an integrator should demand
Three working documents: the protocol checklist, the first-article inspection content, and a range test report template. They are published because the fastest way to judge a supplier is to see whether they can answer a document question precisely.
Serial protocol checklist
Twelve fields a protocol document must state — framing, endianness, checksum coverage, error codes, timing, example transcript.
First article inspection
What an FAI record carries, and why a supplier who cannot produce one is selling samples.
Range test report template
Twelve fields that turn a range number into something another engineer can check.
Need an interface document for a model?
Send the model code.
Email tommy@erdimail.com
Buyer answers